UAE 6G 145 Gbps network upgrade hero image featuring Sheikh Mohamed bin Zayed, Etisalat by e&, Burj Khalifa, and fiber optic cables replacing copper Cat6 lines — representing UAE’s leap toward next-gen connectivity.

UAE 6G Trial 145 Gbps: Why Legacy Copper Cabling Can’t Handle the Next-Gen Network

Futuristic 6G network infrastructure in Dubai with Burj Khalifa skyline, fiber optic cables replacing copper wiring, and engineers upgrading systems under CALLIT IT INFRASTRUCTURE branding.

The UAE’s 145 Gbps 6G trial, led by Etisalat by e&, marks a global benchmark in network speed and connectivity.
But this breakthrough goes far beyond wireless communication — it’s a
wake-up call for every Dubai business still running on outdated copper networks.

Even the most advanced copper cabling standards — Cat 7 and Cat 8 — cannot handle 6G-level data throughput. These cables struggle with signal loss, heat buildup, and bandwidth limitations, especially across longer distances.
When cable runs exceed 20 meters,
SFP-to-RJ45 adapters overheat, causing link throttling, CRC errors, and network dropouts during heavy data transfers.

The next-generation 6G infrastructure demands fiber-optic cabling — engineered for 145 Gbps performance across media production studios, data centers, financial firms, and smart office environments that rely on real-time collaboration and low latency.

CALLIT IT INFRASTRUCTURE helps UAE companies transition to 6G-ready fiber networks, upgrading cabling, switches, and server connections to deliver uninterrupted high-speed connectivity, enterprise-grade reliability, and future-proof scalability.

Visual comparison of copper Cat 7 and Cat 8 network cables overheating versus modern fiber optic cables running cool with blue terahertz glow, showing heat buildup in SFP to RJ45 adapters over 20 meters — CALLIT IT INFRASTRUCTURE Dubai.
Comparison of Cat 8 copper cables emitting EMI interference versus glowing blue fiber optic cables delivering clean light signals — representing 6G speed, fiber reliability, and CALLIT IT INFRASTRUCTURE network upgrades in Dubai.

Why Cat 5/6/7/8 Cables Fail Under 6G Load

⚙️ Bandwidth Limitations

Cat 5 and Cat 6 are limited to 1 Gbps and 10 Gbps respectively.
Cat 7 and Cat 8 can theoretically reach
25–40 Gbps, but only over short distances (< 20 m) under ideal lab conditions.
At
145 Gbps, the signal’s rise time exceeds the cable’s ability to preserve waveform integrity, leading to distortion and CRC errors that corrupt data at high throughput levels.

🔥 Thermal Stress and Adapter Limitations

When companies attempt to bridge fiber backbones into copper networks using SFP-to-RJ45 transceivers, severe heating occurs.
Each module draws
> 2.5 W per port at 25 Gbps+, and over cable runs beyond 20 m, attenuation and EMI force the PHY to amplify output, pushing internal temperatures above 70 °C.
During continuous file transfers (such as multi-terabyte uploads in media studios),
thermal protection triggers, causing port shutdowns or disconnections.

CALLIT IT INFRASTRUCTURE engineers have seen this repeatedly during 25 GbE and 40 GbE deployments — short copper links that seem stable at 10 Gbps begin failing immediately under sustained high-transfer workloads.

Electromagnetic Interference (EMI)

Copper behaves like an antenna at multi-gigahertz frequencies.
Even
Cat 8 S/FTP shielding cannot fully eliminate signal coupling between adjacent lines, resulting in packet retransmissions, noise, and latency spikes that make copper unusable for 6G-class reliability.

Fiber optics powering 145 Gbps 6G network stability in Dubai, glowing blue connections replacing outdated copper cabling — CALLIT IT INFRASTRUCTURE installing OM4/OM5 multimode fiber, SFP+, SFP28, QSFP switches with active cooling for enterprise-grade performance.

Fiber — The Only Path to True 145 Gbps Stability

Fiber optics transmit light, not electricity. That single difference eliminates the three major copper problems:

  • No signal degradation over 100 m+.
  • Zero EMI.
  • No heat buildup inside transceivers because SFP+/SFP28 modules operate optically and dissipate minimal power.

CALLIT IT INFRASTRUCTURE deploys:

  • OM4/OM5 multimode fiber for 25 – 400 GbE networks.
  • SFP+, SFP28, QSFP switches with active cooling and redundant power.
  • Fiber management systems with precise labeling and test reports for data integrity verification.

This ensures 145 Gbps and beyond can flow continuously without packet loss or downtime — ready for future 6G data streams.

Digital illustration showing Dubai’s film studios, hospitals, offices, and smart hotels interconnected by glowing blue fiber optic lines symbolizing 6G 145 Gbps speed — CALLIT IT INFRASTRUCTURE enabling nationwide fiber upgrades for media, healthcare, and enterprise networks.

Industries That Must Upgrade Now

The impact of 6G is fastest in data-intensive sectors such as:

  • Media & Film Production: 8K RAW footage, multi-TB uploads, real-time editing.
  • Post-production & DIT Services: Checksum verification, shared storage on QNAP/NAS at multi-gig speed.
  • Corporate Offices: Cloud collaboration and VoIP reliability.
  • Hospitals & Research Labs: Massive data imaging and AI analytics.
  • Hotels & Smart Properties: IoT control and high-density Wi-Fi access.
CALLIT IT INFRASTRUCTURE audits, designs, and installs fiber backbones tailored to each industry’s data demands — so they can fully utilize Etisalat by e&’s next-gen 6G network.


CALLIT IT INFRASTRUCTURE engineers performing a full 6G migration upgrade in Dubai, showcasing advanced fiber optic cabling, SFP+/SFP28 switch deployment, and precision thermal-managed cabinets for enterprise network transformation.

Upgrade with CALLIT IT INFRASTRUCTURE — Your 6G Migration Partner

CALLIT IT INFRASTRUCTURE helps UAE businesses transition from outdated copper-based systems to next-generation fiber networks ready for 6G’s 145 Gbps revolution. Our certified engineers conduct full-scale on-site infrastructure audits, assessing your switches, patch panels, and cabinet airflow to pinpoint every performance bottleneck.

1️⃣ Network Audit & Design: Detailed inspection of all existing cabling, switching, and routing layers.
2️⃣
Copper Replacement: Full migration from Cat 5/6/7/8 to high-performance OM4/OM5 fiber backbones.
3️⃣
Switching Upgrade: Deployment of SFP+/SFP28 architecture for 25–100 GbE connectivity with active cooling.
4️⃣
Thermal Management: Precision cabinet redesign to prevent overheating and optimize power delivery.
5️⃣
Performance Validation: End-to-end fiber certification and 6G readiness testing for sustained 145 Gbps transfer.

From media studios handling 8K footage to corporate data centers, hospitals, and smart buildings, CALLIT IT INFRASTRUCTURE ensures your systems are built for the future of connectivity, reliability, and speed.